Projects
Detailed write-ups of individual projects. The full list of work is under References.
Advanced Controllers for CFB Boilers

260 t/h at 100 bar, firing petroleum coke, coal, gas and fuel oil, with the coke calorific value calculated automatically from the combustion result.
Power Plant Performance Calculation

Boiler, turbine and heat exchanger efficiency against design values, live in the control system, with the cost of each deviation attached.
